SPACES

Stage 11

Description

3-Wall CYC, Green Screen; Motion Capture, SloMo, and Volumetric Capture stage; Pre-Lit LED, Full Motion Gantry System, Full Grid

Size

  • 5,000 SQF
  • W50’ D100’ H28’

5,000 SQF

FOOTPRINT

W50’ D100’ H28’

DIMENSIONS

Who Uses This Stage?

One of the only pre-lit LED, dedicated 3-wall green CYCs in Los Angeles, Stage 11 is perfect for productions that endeavor to innovate in post. Also available are over 200 proprietary digital sets and boutique services to help bring your dream job to life. From feature films to national campaigns, this space has seen everything from high-wire harness stunts to award-winning VR executions.

Take your set to the next level with an internal elephant door linkage to Stage 10, our XR Stage

big_image_1
left_image_1 left_image_2
[DEDICATED PRE-LIT GREEN]

Details

  • 5,000 SQF
  • W50’ D100’ H28’
  • 3-Wall CYC
  • Motion Capture, SloMo, and Volumetric Capture Stage
  • Dedicated Green
  • Pre-Lit LED
  • Interconnects with Stage 10 via 10'X10' elephant doors
  • Concrete Floors
  • 1 (16'X40') Flying Flat
  • Full Motion Gantry System
  • Full Grid
  • Cisco Meraki WiFi Access Points
  • Dedicated ethernet access up to 1 Gbps available** optimized for QTake + video conferencing
  • 1 Gbs fiber optic internet (scalable to 10 Gbps**)
  • Private fiber optic network optimized for video delivery **Dedicated ethernet link speeds from 750 Mbps-10 Gbps require 4 weeks lead time for provisioning and must be quoted separately
  • Accessible bt Vehicle
  • Permitted for Filming
big_image_2

Results

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

Selected Clients

Toyota
Too Faced
Progressive
Go90
MTV
McDonalds
In n Out
BMW